Número de pieza
Desmilitarización
Vigencia
UOM
NIIN
Número de pieza:
622-4436-001
Desmilitarización:
Yes - DEMIL/MLI
NSN
Número de acciones nacionales:
TXT
Descripción:
Electrical Equipment Rack
Código de nombre del artículo:
06353
MRC:
The provision/s/ for mounting the item.ABDR
Mounting Provision:
Hinge w/spring loaded latch and strap
MRC:
An overall measurement between specified points of an item,in distinction from height.ABFY
Overall Depth:
27.350 inches
MRC:
The distance measured in a straight line from the bottom to the top of an item.ABKW
Overall Height:
71.350 inches
MRC:
An overall measurement taken at right angles to the length of an item,in distinction from thickness.ABMK
Overall Width:
24.000 inches
Panel Space Height:
10.193 inches
Panel Rail Thickness:
1.000 inches
MRC:
Indicates the type of door furnished with the item.AERQ
Door Type:
Single front
MRC:
Describes the capabilities,intended use,and/or purpose for which the item is provided.FTLD
Functional Description:
The remote subsystem rack (rss) contains the physical electrical and cooling provisions for installation of line replaceable units with the interconnect monitor unit the rack provides for interconnections between lrus power control and distribution to the lrus and all external data control and power interfaces the rss rack is not an end item it is used with the AN/GSC43 and AN/GSC44 terminals of the air force communication system
MRC:
The chemical compound or mechanical mixture properties of which the item is fabricated.MATT
Material:
Aluminum alloy
MRC:
The style designation indicating the configuration that most nearly corresponds to the appearance of the item.STYL
Style Designator:
Open frame vertical front
MRC:
Characteristics or qualities of an item,not covered in any other requirement,which are considered essential information for one or more functions excluding nsn assignment.SUPP
Supplementary Features:
Ginput power is 115VAC, 50/60 hz W/5 amps maximum current rss rack is provided w/overload protection and connecting cables for all projected lrus mtbf 360 hrs mtbd 59 equip Months mtbm actions 360 hrs