Submarine Hydraulic Systems Parts

End item NSN parts
Filter By: Electrical Power Cable Assemblys
page 1 of 1
Part Number
NSN
NIIN
1197004D713-5 Electrical Power Cable Assembly
012336584
2001770Y0004634 Electrical Power Cable Assembly
013097416
2001770Y0004636 Electrical Power Cable Assembly
013097418
720-1650077-903 Electrical Power Cable Assembly
013097416
840-2010041-923 Electrical Power Cable Assembly
013097418
B660-0625-T327A L2 Electrical Power Cable Assembly
013097416
B660-1995-T003A L2-L240RO(24CM) Electrical Power Cable Assembly
013097418
Page:

Submarine Hydraulic Systems

Picture of Submarine Hydraulic Systems

К-3 was a project 627 "Кит" (kit, meaning "whale"; NATO reporting name "November") submarine of the Soviet Navy's Northern Fleet, the first nuclear submarine of the Soviet Union. The vessel was prototyped in wood, with each of five segments scattered between five different locations about Leningrad, including the Astoria Hotel.

On June 17, 1962, by this time under the command of Zhiltsov, К-3 reached the North Pole underwater, the first among Soviet submarines (a feat was performed nearly four years earlier by USS Nautilus). The submarine also surfaced on the Pole (a feat performed 3 years before by USS Skate). For this voyage, she was awarded the name Leninskiy Komsomol (Ленинский Комсомол) on October 9, 1962, and her crew, rather than training in military operations, began taking part in many congresses and conferences. This idle life continued until the summer of 1967 when a boat that had been scheduled for patrol in the Mediterranean Sea was unavailable. К-3 was tasked with that patrol. She was assigned a new commander, Captain Second Rank Stepanov, and her executive officer arrived aboard only two hours before she put to sea. Whatever the initial material condition of the boat, the crew was not ready for sea. By the time they reached the Mediterranean, the air regeneration system had failed and the temperature on board was 35–40 °C (95–104 °F).

Comparar ahora»
Claro | Esconder